Individual installations typically take 1-2 days per location, with minimal disruption to surrounding areas
The Charge Point Operators (CPOs) are responsible for all maintenance, repairs, and ongoing operation of the charging equipment.
Anyone with a compatible electric vehicle. Users pay the CPO directly for charging sessions
Pricing is set by the EV charger operators and typically charged per kWh of energy used or by time connected.
These spaces will be designated for EVs, and the number of spaces will reflect the mix of non-EV and EV vehicles.
The total number of parking spaces will remain the same, and a small number of spaces will have the added benefit of allowing EV charging.
P: 09 9424 0000
E: ejiang@krg.nsw.gov.au
15 October 2025 – 11 November 2025
All submissions will be considered
Locations to proceed to final assessments and approvals are endorsed
Approved locations will be updated on our Electric Vehicle Public Chargers page.
EV Chargers are scheduled to be installed by May 2026
The following locations are being considered in Gordon and Killara
Click on each location address to view the aerial and street view images along with techinical details.
Your feedback will help us decide on the location of each EV charger.